Government Schemes

Government Initiatives PLI Scheme

On UPSC.wiki

Current affairsElectronics Components Manufacturing Scheme (ECMS): 12 New Projects Approved, Total Reaches 118; Semicon India 2.0 Portal LaunchedThe Ministry of Electronics and Information Technology (MeitY) approved 12 additional projects under the Electronics Components Manufacturing Scheme (ECMS) on November 6, 2026, involving a fresh investment commitment of ₹7,503 crore. Total ECMS approvals now stand at 118 projects across 16 states, with cumulative committed investment of ₹77,051 crore. Union Minister Ashwini Vaishnaw also launched the Semicon India 2.0 web application portal on the same day. Current affairsVGF Scheme for Grid-Scale Energy Storage: Cabinet Approves ₹14,500 Crore for 92 GWh Capacity in BESS, Pumped Hydro and Emerging TechnologiesThe Union Cabinet approved a ₹14,500 crore Viability Gap Funding (VGF) scheme on 4 November 2026 to develop 92 GWh of grid-scale energy storage capacity — covering Battery Energy Storage Systems, Hydro Pumped Storage Projects, and emerging technologies — expected to mobilise ₹97,600 crore in total investment and support India's 500 GW renewable energy target by 2030. Current affairsDraft National Steel Policy Vision 2047: India Targets 604 MT Capacity, Decarbonisation, and Specialty Steel LeadershipThe Ministry of Steel released the Draft National Steel Policy Vision 2047 in October 2026, targeting 604 MT of crude steel capacity, per capita consumption of 302 kg, and carbon emission intensity reduced from 2.54 to 1.54 tCO₂/tonne by 2047. The policy replaces the National Steel Policy 2017 and focuses on raw material security, decarbonisation, specialty steel for defence and aerospace, and trade protection against cheap imports. Current affairsPremier Energies Commissions India's Largest Solar Cell Manufacturing Plant — 7GW TOPCon Facility at Naidupeta, Andhra PradeshPremier Energies commissioned a 7GW N-type TOPCon solar cell manufacturing plant at Naidupeta, Andhra Pradesh, in September 2026 — raising its total capacity to 10.6GW and making it India's largest solar cell manufacturer. The ₹3,293 crore facility, spanning 101 acres, produces approximately 88,000 cells per hour with an average efficiency of 25.8%, advancing India's National Solar Mission targets and domestic manufacturing push under PLI schemes. Current affairsSemicon 2.0 Notified: India's ₹1,27,500-Crore Semiconductor Mission Phase 2 — Indigenous Chip Design, 3-nm Roadmap, and Semiconductor SovereigntyThe Government of India formally notified Semicon 2.0 on August 31, 2026 — a ₹1,27,500-crore programme that expands the semiconductor ecosystem from chip assembly to indigenous design, intellectual property creation, advanced packaging, equipment, materials, research, and talent. India aims to domestically design and manufacture chips for 70–75% of its needs by 2029 and reach 3-nanometre and 2-nanometre technology nodes by 2035. Current affairsHindalco Commissions India's First Superfine PPT ATH Plant in Belagavi: Halogen-Free Flame Retardant and Atmanirbhar Specialty AluminaHindalco Industries (Aditya Birla Group) commissioned India's first greenfield Superfine Precipitated Aluminium Trihydrate (PPT ATH) manufacturing plant in Belagavi, Karnataka on August 27, 2026, with an initial annual capacity of 30,000 tonnes (expandable to 60,000 tonnes). PPT ATH is a halogen-free flame-retardant used in fire-safe cables, polymer insulators, and composites — previously entirely import-dependent. The plant runs entirely on renewable energy.

Related topics

Government Initiatives PLI Scheme — Government Schemes for UPSC | UPSC.wiki | UPSC.wiki