Commissions

Central Electricity Regulatory Commission

On UPSC.wiki

Current affairsIEA India Renewable Energy Market Report 2026: India Surpasses 300 GW RE Capacity, On Track for 530 GW by 2030The International Energy Agency (IEA) released the India Renewable Energy Market Report 2026 at the Bharat Renewable Energy Summit in New Delhi on 3 November 2026, finding that India has become the world's second-fastest-growing renewable energy market, crossed 300 GW of renewable power capacity in Q4 2026 (almost quadrupling over a decade), and is on track to reach 530 GW by 2030 — but faces critical infrastructure gaps in transmission, storage, and dispatch flexibility. Current affairsVGF Scheme for Grid-Scale Energy Storage: Cabinet Approves ₹14,500 Crore for 92 GWh Capacity in BESS, Pumped Hydro and Emerging TechnologiesThe Union Cabinet approved a ₹14,500 crore Viability Gap Funding (VGF) scheme on 4 November 2026 to develop 92 GWh of grid-scale energy storage capacity — covering Battery Energy Storage Systems, Hydro Pumped Storage Projects, and emerging technologies — expected to mobilise ₹97,600 crore in total investment and support India's 500 GW renewable energy target by 2030. Current affairsIndia Carbon Credit Trading Scheme (CCTS): Compliance Carbon Market Becomes Operational in 2026India's Carbon Credit Trading Scheme (CCTS), notified in June 2023 under the Energy Conservation (Amendment) Act 2022, moved into its operational phase in 2026 with the launch of the Indian Carbon Market Portal (March 21, 2026) and emission-intensity targets notified for seven industrial sectors. The Bureau of Energy Efficiency (BEE) administers the scheme, which replaces the Perform, Achieve and Trade (PAT) mechanism and links India's domestic carbon market to its Paris Agreement commitments. Current affairsGreen Energy Corridor Phase-III: Cabinet Approves ₹1.86 Lakh Crore Plan for 135 GW Renewable Evacuation and 50 GWh Battery StorageThe Union Cabinet, chaired by Prime Minister Narendra Modi, approved the Green Energy Corridor (GEC) Phase-III on October 1, 2026, with a total investment of ₹1,86,405 crore. The project will build intra-state transmission systems to evacuate 135 GW of renewable energy and deploy 50 GWh of Battery Energy Storage Systems (BESS) across India by FY 2032-33, supporting India's 900 GW non-fossil fuel target by 2035. Current affairsNTPC and EDF Power Solutions Form 50:50 Joint Venture for Pumped Storage and Low-Carbon Energy ProjectsNTPC Limited and EDF Power Solutions India signed a 50:50 joint venture agreement on September 25, 2026 to develop pumped storage hydropower, hydropower, and other low-carbon energy projects in India and neighbouring countries. The JV targets India's 100.8 GW pumped storage capacity goal by FY2035–36, against a current installed base of only ~7 GW — a gap of ~93 GW in nine years. Current affairs45 Coal-Fired Power Plants at Critical Fuel Levels: India's Energy Security Warning and the Coal-Logistics ChallengeGovernment data as of August 27, 2026 shows 45 thermal power plants operating with critically low coal stocks — equivalent to approximately 10 days of operational requirement — up sharply from 31 plants at end-July. Stocks fell 19% from end-July levels as El Niño-linked demand surges and monsoon-disrupted rail logistics widened the gap between coal receipts and burn rates. Current affairsIndia Crosses 300 GW Non-Fossil Fuel Installed Electricity Capacity: A Milestone in Clean Energy TransitionIndia's installed non-fossil fuel electricity generation capacity crossed 300 GW (300.50 GW) as of 31 July 2026, announced the Ministry of New and Renewable Energy on 10 August 2026. This represents 54% of total installed capacity of 552 GW and over 60% of India's Paris Agreement NDC target of 500 GW non-fossil capacity by 2030.

Related topics

Central Electricity Regulatory Commission — Commissions for UPSC | UPSC.wiki | UPSC.wiki